EJAMJP2_Fig.1_Hamaoka_Nuclear_Exhibition_Center_in_Omaezaki-city,Shizuoka OTjapan JSM 7th Annual Conference at Omaezaki, Shizuoka
OTJP3_Fig5_Visiting_Onagawa_Nuclear_Power_Plants OTjapanReport on "Maintenance Science Summer School 2010"
EJAMOT_CN3_Figure1_The_outside_view_of_CEFR OTChinaPlanning and Consideration on SFR R&D Activities in China
< All Occasional Topics

Information
ENDE2011 10–12 March 2011,
ENDE' 2011, Chennai, India

Issues
  Vol.2 No.4 (Feb-11)up
Vol.2 No.3 (Nov-10)
Vol.2 No.2 (Aug-10)
Vol.2 No.1 (May-10)
< Other Issues

Featured Articles
EJAM2-4NT29_Fig.4_Model_of_Drive_Force_Transmission_Mechanism_of_Motor-Operated_Valve CBM of Motor-Operated Valves in NPPsup
EJAM2-4NT30_Fig.4_CBR_operation_schedule Replacement Operation Schedule Management of Main Control Boards..up
EJAM2-4NT31_Fig.3_Schematic_drawing_and_photo_of_prototype_in-pile_crack_growth_test_rig Current Status of Tec. Dev. of In-pile Tests for IASCC..up
EJAM2-4NT32_Fig.1_Schematic_diagram_of_TiO2_injection SCC mitigation method by TiO2 techniqueup

JSM
Contacts
(EJAM): ejam@jsm.or.jp
(JSM): secretariat@jsm.or.jp
HP: http://www.jsm.or.jp
(in English)

 
OT1 - OT2 - OT3 - OT4 - OT5 - OT6 - OT7 - OT8 - OT9 - OT10.. All OTs
Occasional Topics
OT4 (09-09-16)
 
Ageing Management of Nuclear Power Plants in TEPCO
 
Hiroshi ABE and Toshiaki NISHIYAMA (Tokyo Electric Power Company)
 
KEYWORDS:
Ageing Management, TEPCO, Fukushima, Maintenance, Replacement, Reacter Internals, Core Shroud, Turbine Rotor, SCC, Corrosion, Mainenance Plan
 

Full Download( PDF)
slide
  1. Ageing Management of Nuclear Power Plants in TEPCO
Hiroshi ABE and Toshiaki NISHIYAMA
August 2009
Tokyo Electric Power Company
  2. Number of Aged Nuclear Power Plants in Japan
  3. TEPCO’s Nuclear Power Plants
  4. Fukushima Dai-ichi Nuclear Power Plant (1F NPP)
  5. Maintenance Activities
  6. Replacement of RPV Internals

・Fukushima-Daiichi Unit 3 (1998), Unit 2 (1999), Unit 5, (2000), Unit 1 (2001)
・The shrouds and other internals such as FW sparger replaced with SUS316L

  7. Replacement of Turbine Rotor

・Fukushima-Daiichi Unit 1: 1989, etc.
・Crack indications in the discs (due to SCC)

  8. Evaluation Components in Ageing Management Study
  9. Procedure of Ageing Management Study
10. Procedure of Ageing Management Study(2)
11. Procedure of Ageing Management Study(3)
12. Results of Evaluation

Most components
 Long-term and safe operation is possible if the current maintenance is continued
Some components
 Some additional maintenance for AM is required
    => Establish the 10-year maintenance plan

13. Example of Added Maintenance Task (Fukushima-Daiichi Unit3)

Ageing Management on PCV (Primary Containment Vessel)
 => Evaluation :
   Possibility of corrosion at carbon steel shell of PCV
 => Current maintenance tasks:
   Leak rate test, VT on painted surface
 => Added maintenance tasks:
   Measurement of wall thickness

14. Example of Added Maintenance Task (Fukushima-Daiichi Unit3)(2)
15. Summary and Up-coming Issue

TEPCO introduced “Ageing Management in our NPPs” this time.
We will report “New Maintenance Strategy and Effective Ageing Management” at the next Occasional Topics in EJAM